Challenge:

Ferring Controlled Therapeutics a Leading speciality in biopharmaceuticals, had projects running to fully install new IT infrastructure at a new manufacturing plant in Scotland and upgrade an existing building's network capacity and wireless efficiency. They need help in procuring various items for the project to be completed on time, which they were having difficulty sourcing via their Cisco channel. 

Solution:

Flux-IT worked with Ferring Controlled Therapeutics over a 6 month period, helping to supply the needed equipment in their new manufacturing building when the lead times and pricing was increasing during the manufacturing shortage.

The required hardware for these projects over the 6-month period totals 9 Cisco switches and ~80 Cisco APs along with the connection equipment related to these devices. All of the deadlines for delivery were met earlier than expected and the services provided were exactly as needed.

Testimonial:

Ferring Controlled Therapeutics Said; 'The service and support received from Flux-IT were extremely refreshing, as a global company we are usually tied into contracts preventing us from approaching local suppliers directly but due to the lead times and equipment prices provided by Flux-IT at the time for what we needed we were more than willing to push through the exception. The kit we received was all as advertised and genuine, we had no issues with delivery and the lead times provided were accurate. We will be considering Flux-IT for our future IT requirements.

Want to know more about our IT hardware procurement service and how we can help to save money and reduce lead time?

Arrange a quick call with our sales team today.

Contact Us

Give us your contact details below and we’ll get back to you as quickly as humanly possible.